A Richer Life

Lavish Hmes Set
In A Plush Campus

Ultima Pearl brings with it a strong lineage of premium, high quality residences.

The brand Kamlesh Gandhi Projects has been synonymous with Quality. Each of our successfully executed projects reflect our philosophy of creating value for the buyers, creating a comfortable abode for the residents and creating an ambience of Luxury for everyone to enjoy.

Ultima Pearl, our newest Bungalow development comes at Ankhol, Waghodia Road. Standing apart with its thoughtful planning, deft execution and best value for the investment, these stately 4B2HK Bungalows are a true delight.

Specificatins

STRUCTURE

RCC Frame Structure

MASONRY

AAC Blocks for External and Internal walls

WALL FINISH

Primer coat on internal walls and Weather resistance paint on external walls

FLOORING

Vitri fied tiles in Living, Dining, Kitchen and all Bedrooms

Ceramic tiles in balcony

TOILET

Designer wall tiles as per Architect's design & speci fications

Branded C.P. Fittings and Sanitary vessels

DOORS

Main door veneer Finish flush door

Internal doors Flush doors

WINDOWS

Aluminum windows

KITCHEN

Granite kitchen platform with S.S. Sink and Designer wall tiles as per Architect's design & speci fications

ELECTRIFICATION

Branded lSI Concealed copper wiring with Elegant branded modular switches

ANTI-TERMITE

Anti-termite Treatment

Amenities

Home Theatre

Gymnasium

Multipurpose Hall

Indoor Game Room

Eco-Friendly Courtyard

Grand Entrance gate with security cabin

Landscaped Garden

Children's Play Area

Children Pick-up/ Drop off zone

Underground Cabling for cleaner look

Rainwater Harvesting

Visitor's Parking

Views

Entrance

Bungalow Front View

Residence Row

Evening View

Club House

Second Floor

Family Sitting

Dining Area

Eco Friendly Courtyard

Layut & Plans

Prgress Tracker*

APRIL PROGRESS

Work undertaken in the month of April included concreting of GF slabs for U22-23, 64-65 & 80-81

FF Slab concreting for U24-25, 45-46, 68-69 & 78-79

Plinth level backfilling at U31, 40-41 & 44

RCC at plinth level for U31, 40-41 & 44

Masonry at plinth level for U40-41 & 44

Ground beam for U40-41

Excavation & foundation work has started for club house

Labor force was still low for the month of April due to slowness of their return to work

nsite Updates

Clubhouse Foundation
April 2022

U90-91 GF Slab
April 2022

U22-23 GF Slab
April 2022

U45-46 FF Slab
April 2022

U22-23 GF Slab
April 2022

FF Slab U47-48
March 2022

Plint Level RCC U92-93
March 2022

Plint Level RCC U42-43
March 2022

Finished Project Entrance Gate
February 2022

Units 53 - 58
February 2022

Pile Caps U82-83
January 2022

U20-21 FF Slab
January 2022

U53-54 FF Slab
December 2021

U59-63 RCC at Plinth Lvl
December 2021

U72-75 Plinth Lvl Masonry
December 2021

U76-77 Plinth Preparation
December 2021

Entrace Gate
November 2021

Plinth Backfiling & GF Slab U84-85
November 2021

Plinth LVL RCC U45-50
November 2021

Soil Leveling - For Piling
November 2021

GF Slab U-20, 21, 26 & 27
October 2021

GF Slab U-53 & 54
October 2021

Slab work preparation for units 20-21
September 2021

SF Open Terrace Waterproofing
September 2021

RCC work at Plinth Lvl Units 51-54
September 2021

Gypsum Punning False Ceiling
September 2021

Staircase Concreting
September 2021

External Plaster U - 9 & 10
August 2021

Plumbing SWR Lines U - 9 & 10
August 2021

Bitumen Application at Plinth Level U 45 - 50
August 2021

Brick Bat Coba Waterproofing U 9 & 10
August 2021

Shuttering work for Main Gate
July 2021

Ground Floor Slab Work U-5, 6, 11 & 12
July 2021

Backfilling upto Plinth Level
July 2021

Plinth Level Masonry U-45 to 52
July 2021

RCC Plinth Level Slab U-26 to 27
July 2021

AAC Blockwork U-9, 10
June 2021

Pile Cap Work U 64 to 75
June 2021

Column Work & Bitumen Application at Plinth
June 2021

Ground Beam Concreteing & Masonry
May 2021

Pile Cap Shuttering & Concreting
May 2021

Aerial View of Grnd Beam Steel Work Units 1-16
April 2021

Aerial View of Grnd Beam Steel Work Units 17-30
April 2021

Aerial View of First Floor Slab Units 9-10
April 2021

Sample House FF Slab Formwork
March 2021

Grnd Beam Laying Units 1-16
March 2021

NW Side Progress
March 2021

Pile Cap for Units 58-63 Piling for Units 64-75
March 2021

Soil Surface Levelling for Pile Cap Base
February 2021

Piling Work
February 2021

Pile Cap Concreting
February 2021

Formwork for Pile Cap
February 2021

Bitumen Coating for Plinth Protection
February 2021

Pile Augering
January 2021

Piling Work for Units 1-16
January 2021

Site Access Way
January 2021

Site Office
January 2021

Site View
January 2021